Abstract
At the University of Colorado at Boulder, the custom design and construction of a 34,500 square foot laboratory and classroom facility from the ground up provided a unique opportunity for engineering educators to use the building itself as an educational tool. This curricular concept and accompanying building data system at the ITL laboratory is called 'Building-as-a-Leaming-Tool,' or BLT. The web-based BLT software system continuously monitors more than 300 building systems sensors, enabling engineering faculty and students to use the BLT system as a distance-learning tool to take the 'pulse' of the building from anywhere in the world (see http://blt.colorado.edu).
| Original language | English |
|---|---|
| Pages (from-to) | 379-388 |
| Number of pages | 10 |
| Journal | International Journal of Engineering Education |
| Volume | 19 |
| Issue number | 3 |
| State | Published - 2003 |
| Externally published | Yes |
Fingerprint
Dive into the research topics of 'Exploiting an engineering building as a unique distance-learning tool'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver